EAA and SwitzerlandItaly

Acea Produzione SpA (ITA)

J920 FLEXTRA ENGINES DELIVER ENHANCED FLEXIBILITY
greater efficiency, and lower emissions

Location

Rome, Italy

Installed engines

3 x J920 FleXtra

Electrical output

28.5 MW

Thermal output

21.9 MW

Total efficiency

>80 %

Commissioned

2017, 2020
EAA and SwitzerlandGermany

Fernwärme Ulm GmbH (GER)

INNIO ACCELERATES HEAT TRANSITION
Ulm completes its coal phaseout, thanks to two Jenbacher J920 FleXtra cogeneration plants

Location

Ulm, Germany

Installed engines

2 x J920 FleXtra

Electrical output

2 X 10 MW

Thermal output

2 x 9.6 MW

Total efficiency

48.8%1

Energy source

Pipeline gas

Commissioned

2022
EAA and SwitzerlandGermany

J920 FleXtra in Stapelfeld Schleswig-Holstein (GER)

J920 FleXtra, centerpiece of the largest cogeneration plant in North Germany

Location

Stapelfeld, Germany

Installed engines

1 x J920 FleXtra

Power output

9,513 kW

Thermal output

~ 10,000 kW

Total efficiency

> 95%

Commissioned

2015
North AmericaUnited States

Muddy Creek Wastewater Treatment Plant (USA)

COMBINED HEAT AND POWER FACILITY
helps wastewater treatment plant increase efficiency, reduce power costs, meet environmental compliance

Location

Winston-Salem, North Carolina, USA

Installed engines

1 x J416

Electrical output

1,137 kW

Thermal output

805 kW

Energy source

Sewage gas

Commissioned

2020
EAA and SwitzerlandGermany

Stadtwerke Bad Säckingen (GER)

NEW GENERATION
Jenbacher J420 E driving the energy transformation forward

Location

Säckingen, Germany

Installed engines

1 x J312, 2 x J416, 2 x J420 E

Electrical output

5.7 MW

Thermal output

6.2 MW

Energy source

Biomethane

Commissioned

2012, expanded: 2020
EAA and SwitzerlandGermany

BGA Högl – Biogas​ (GER)

BGA Högl

Location

Volkenschwand, Germany

Installed engines

2 x J420 D25

Electrical output

1,501 kW​

Energy source

Biogas

Commissioned

2018
EAA and SwitzerlandGermany

Bioenergie Haag-Preis​ (GER)

Bioenergie Haag-Preis​

Location

Rain, Germany

Installed engines

1 x J420 D25​

Power output

1,500 kW

Energy source

Biogas

Commissioned

2018
North AmericaUnited States

Wolf Run, IMG Energy Solutions (USA)

MEETING INDEPENDENT POWER PRODUCER'S PEAK POWER NEEDS
A highly flexible, quick start, modular 5-unit solution is delivering 21 MW of reliable power

Location

Bradford County, Pennsylvania, USA

Installed engines

5 x J624

Electrical output

21.8 MW

Total efficiency

44.7%

Energy source

Pipeline gas

Commissioned

2019
North AmericaUnited States

Sky Global Power One (USA)

Natural gas power plant provides grid support during unusual winter storm crisis in Texas

Location

Rock Island, Texas, USA

Installed engines

6 x J920 FleXtra

Electrical output

51 MW

Energy source

Pipeline gas

Commissioned

2016
North AmericaUnited States

Owensboro Grain Company (USA)

Combined heat and power facility helps grain processing company significantly reduce its dependence on utility power, slash power costs.

Location

Owensboro, USA

Installed engines

3 x J620

Electrical output

9.9 MW

Energy source

Pipeline gas

Commissioned

2014
North AmericaUnited States

U.S. Marine Corps Air Station (USA)

Cogeneration means reliable power, cost savings for the U.S. Marine Corps

Location

Beaufort, South Carolina, USA

Installed engines

1 x J320

Electrical output

1 MW

Energy source

Pipeline gas

Commissioned

2010
EAA and SwitzerlandGermany

Stadtwerke Rosenheim (GER)

The J920 FleXtra engine from INNIO allows the city of Rosenheim to generate flexible distributed power & heat by operating in a highly efficient combined heat and power application mode.

Location

Rosenheim, Germany

Installed engines

1 x J920 FleXtra

Electrical output

9.5 MW

Thermal output

10 MW

Energy source

Pipeline gas

Commissioned

2017